Base Frame Complete

Trailer base frame

Best Built Trailers in Thomson, GA built our trailer from the wheels up. Here's the base frame complete — with two 7K lb axles to hold the beast. The frame is being flipped over onto the wheels.

Wood-Fired Oven Table Done

Oven table

The table for the wood-fired oven is done. I mixed & poured vermiculite concrete for a thermal barrier. It is VERY light — I could pick up one side of the table, concrete and all!

Frame Walls Are Up

Frame walls

Three walls are framed in — finally. The table is sitting in the back of the trailer, but will be taken out to put in the floor before the oven is built on it.

Skin Is On

Trailer skin

Skin is on (at least part of) the trailer. One of our fridges is in but not bolted down yet. Workin' on it!!!!

Vending Window Installed

Vending window

Vending window is in, along with the pop-up serving shelf.

Oven Building Begins

First oven piece

Installed 2 layers of hard ceramic fiber insulation on the vermiculite concrete. Then put in the first piece — the oven opening. This one piece is over 400 pounds! She's a beaut, Clark!!!

Oven, Part 2

Oven part two

Building this beast was very tiring, but really, really fun. Had to support the leaves as I put them in and use some creative manipulation to get these 200+ pound pieces tight enough — but not too tight, for heat expansion.

Almost There

Oven almost assembled

The puzzle is coming together!

Oven Shell Complete

Oven shell complete

Last piece of the oven is in place.

Cemented

Cemented seams

Cemented the seams.

Oven Strapped

Oven strapped

Cross-strapped the oven in & bolted it through the floor for support.

Bricking Starts

Bricking the arch

Bricking in the oven arch with antique brick — from approx. the 1800s, thanks to the Brick Yard in South Augusta.

Finished Arch

Finished brick arch

Added another set of tie-down straps and finished the brick arch, but need a replacement floor tile from Forno Bravo (the first replacement was the wrong size). Hoping to bring the trailer home tomorrow!

Wall Frame Up

Wall frame around oven

Wall frame up around the oven. Just have to skin it and we're done.

She's Home

Trailer at home

Brought it home laaate yesterday. Now it's a whiteboard in more ways than one. These are my new offices: the Base of Operations (BoO) and the mobile Gusta. It's moving now!

BoO Building Starts

Water connection

Trenched & installed water to the BoO.

Go Mitchell

Mitchell trenching

Mitchell helping out with the trencher.

First Fire

First fire in the oven

Fired up the oven (12/21)!!! Just a small fire for about 4 or 5 hours to start chasing away a little moisture before putting on the insulation & stucco. I'm gonna enjoy doing this!!! Love building a fire.

Ceramic Fiber Batting Install

Ceramic fiber batting insulation

Installed ceramic fiber batting insulation — 4 inches thick on the sides and 6 inches on top. Should be a great heat sink. Next steps: SS lath & stucco. Unfortunately the forecast calls for freezing weather for a $%#@! week, so no stucco until it warms up a bit. Learning patience — just wish I could learn faster.

Most of Our Boys Working

The boys installing lath

Got some help today!!! Not only did the weather finally warm up, but I got (most of) my boys working on the trailer. Michael, Mitchell & Andrew helped me install the lath. Tomorrow we'll put on the base coat of stucco. Looking forward to it!!

Progress

Trailer progress

Slowly but slowly, it's coming together. May not look purdy, but I like it! Thank you, Lord, for GREAT weather!!!